The weather didn’t cooperate as expected for our temporary signal project in Medway Maine. Just when we thought winter was over, Mother Nature surprised us with another 20 inches of snow at the job site!
The project in Medway involves installing a temporary hardwired signal system with a single-point controller, housed in a NEMA cabinet. It includes detection from all directions using six 35-foot poles and eight signal heads. This setup aims to maintain consistent traffic flow while New England Infrastructure replaces the decking of the Route 157 overpass.
Today we focused on installing guy wires to support the poles before installing the signals. Despite the snow, we are on track to complete the project and have it operational by April 15th.